Construction Planning and Management Systems Using Primavera (Hybrid)

ENGNR X 407.3

4.00 units

Reg. # Status Location Start Date Qtr/Yr Fee
246034W Closed WestwoodWestwood: 219 UCLA Extension Bldg. 10995 Le Conte Ave.
4/3/2014 SP 14 $1,095 Notify Me

This course presents an in-depth study of the current systems and techniques applied in construction planning, scheduling, control, and delay impact analysis. Instruction emphasizes the Critical Path Method approach to developing baseline schedules, progress measurement, earned value, integrated management systems, and as-planned versus as-built analysis. The course also includes hands-on computerized scheduling using Primavera Systems software. As part of the course each student receives a copy of the software.

Prerequisite: X 407.1 Construction Management, or equivalent experience and consent of instructor.

Required course in the Construction Management Certificate.